Engineering Economics / A visual course

Better decisions.
One timeline.

Should you buy the machine, change the loan, or invest in the upgrade? Connect costs, time, and value—and learn to justify the choice.

Explore thirty visual lessons, live mathematical models, and practice that connects each answer to its meaning.

Course progressLoading progress…

Reading your saved completion. Completion is saved on this browser.

An investment today. Benefits over time.
A common date makes the comparison possible.

PW=−P+∑t=1NCt(1+i)tPW=-P+\sum_{t=1}^{N}\frac{C_t}{(1+i)^t}Change a project below ↘
Why this course matters

Every design has a cost.
Every choice has a future.

Clean energy equipment, a production line, a student loan, or a replacement pump: the most useful option depends on when money moves and what you give up to commit it.

Move between a physical decision, its cash-flow diagram, and its equation. Learn to calculate the result and defend the assumptions behind it.

What we’ll investigate

Three questions. One useful framework.

Choose a question

What is money worth later?

A future receipt and money available today are different opportunities. Interest and equivalence put both on a common date.

Try this idea ↗
A decision you can change

When is a project worth its cost?

Change the investment, annual benefit, MARR, and life. Follow the cash flows and watch PW change. PW, FW, and AW are the same project expressed on different clocks.

Explore the full explanation ↗
012345Receipts (+)Expenses (−)

Period 0: −$50,000.00. This is the time-zero cash flow. Periods use the payment interval stated in the model.

-24.0k0524.692525.0k50Present worth ($)MARR (%)
● Current scenarioPresent worth
net present worth · $PW=6861.801541,FW=11051,AW=1810.12596PW=6861.801541,\quad FW=11051,\quad AW=1810.12596

The independent project meets the MARR on these assumed cash flows.

Follow the reasoning

Draw the investment as negative at time 0 and net benefit as positive at years 1–N.

Cash-flow dates and signs are part of the answer. Model values retain precision; displays round money to cents. Illustrative assumptions exclude taxes and inflation unless stated.

Your learning path · 30 lessons

A little structure.
A better decision.

Start with costs and cash-flow timing. Build the interest toolkit, evaluate an investment, then compare the alternatives fairly.

Each lesson pairs a live model with two numerical problems and a conceptual check. Twenty-one mixed problems help you choose a method independently.

Begin the course ↗
01Frame the decision+

Principles, costs, design, estimation

Unit progressLoading progress…

Reading your saved completion.

02Put cash flows on one clock+

Interest, equivalence, loans, factors, annuities, gradients, interpolation

Unit progressLoading progress…

Reading your saved completion.

03Match rates and periods+

Nominal/effective rates, different periods, continuous compounding

Unit progressLoading progress…

Reading your saved completion.

04Evaluate a project+

Marr, pw/fw/aw, recovery, perpetual life

Unit progressLoading progress…

Reading your saved completion.

05Understand returns and recovery+

Irr, interpolation, non-simple flows, err, payback, mcdm

Unit progressLoading progress…

Reading your saved completion.

06Compare alternatives fairly+

Pw, incremental irr, unequal lives, project relationships

Unit progressLoading progress…

Reading your saved completion.

Make your study time diagnostic.

  1. Work one topic without opening a solution; note exactly where you get stuck.
  2. Use its visual model to repair the misconception, then solve the new scenario.
  3. Complete mixed practice on paper to test method selection, not recognition of a heading.
  4. Build your own concise reference. Reserve space for timing reminders, rate conversion, IRR caveats, and unequal-life assumptions.

Start with a real decision and follow it through the picture, the mathematics, and the assumptions. Progress records the topics you choose to mark understood.